powered by

Install New Risers and Treads

From Deck Stairs · Step 5 of 8 · Video by stairbuilding

Showing 6:51–7:45 of the source video. Watch the full video with every moment.

What happens in this clip

With the structural supports in place, install the new risers and treads. The new risers will not necessarily fit into the dadoed slots in the stringer, or it may be too difficult to install them if they do. Cut each riser and tread to fit precisely into its position. You can start the installation from either the bottom or the top of the stairway, whichever is more convenient for your workflow. Fasten the risers and treads securely using screws or nails. Pay attention to the squareness of the cuts, especially on sides that will be visible, as some sides might not be perfectly square depending on the existing stringer. The level of importance for precise cuts will depend on the desired finish and visibility of the stairs (e.g., if they will be carpeted).

Goal: Fit and secure new risers and treads into the repaired stair structure.

What's used

Tools

  • Drill/Driver
  • Measuring Tape
  • New Risers
  • New Treads
  • Saw
  • Miter Saw
  • Table Saw
  • Screws
  • Square

About the full video

This DIY project provides detailed instructions for repairing or reinforcing stairs with housed (dadoed) stringers, which are common in older homes, by addressing structural problems like gaps between treads, risers, and stringers. The project outlines methods for removing damaged components, accessing the underside of the stairs, and installing new support structures or replacing the treads and risers.

Step 5 of 8: Cut and Attach Risers (Optional)

If desired, measure and cut pieces of wood to fit vertically between each tread. These are the risers. Attach them securely to the front of each tread support on the stringer, using screws or nails. Ensure they are level and evenly spaced.

Open this step in the guide

Every video in Deck Stairs

  1. Step 1: Prepare the Stair Location

  2. Step 2: Mark Stringer Placement

  3. Step 3: Attach Stringers to Deck

  4. Step 4: Secure Stringers to Ground

  5. Step 5: Cut and Attach Risers (Optional)

  6. Step 6: Install Treads

  7. Step 7: Install Railings

  8. Step 8: Final Inspection and Finishing Touches

Questions about Deck Stairs

What tools and materials are essential for building deck stairs using pre-cut stringers?

You will need basic tools like a measuring tape, level, drill with drill bits, shovel, and rake for site preparation. Key materials include pre-cut pressure-treated pine stair stringers, gravel and concrete mix for securing the base, appropriate exterior structural lag screws, and decking boards for the treads. The specific list provided includes items like Anvil digging shovel, OX marking pencil, Empire plumb bob, Quikrete gravel, SAKRETE concrete mix, SPAX lag screws, and Composite Decking Boards.

What are the most critical safety precautions I should take when building deck stairs?

Safety is paramount for structural projects like deck stairs. Always wear appropriate personal protective equipment, including safety glasses, gloves, and sturdy footwear. Ensure all connections are secure and stable, especially where stringers attach to the deck and ground. Always follow manufacturer's instructions for materials and power tools, and verify stability at each step.

How can I ensure my deck stairs comply with local building codes?

Compliance with local building codes is crucial for safety and legality. Before starting, consult your local building department for requirements on rise, run, width, handrails, and foundation for deck stairs. These codes vary by location and are designed to prevent structural failure and ensure safe use. Hiring a licensed professional can help navigate these complex requirements.

What common mistakes should a beginner avoid when installing pre-cut stair stringers?

A common mistake is improper site preparation, leading to unstable ground support. Ensure the ground is level, well-compacted, and has adequate drainage using gravel and pavers. Another error is not securely attaching the stringers to both the deck and the ground, which can compromise the entire structure's stability. Always double-check measurements and use a plumb bob and level for accurate placement.

What is the estimated time commitment and difficulty for this deck stair project?

This project is rated as 'beginner' difficulty with an estimated time of 3 days. However, factors like your experience level, site conditions, and adherence to local codes can extend this. Breaking the project into manageable steps and having all tools and materials ready will help keep it on schedule.

Are there alternative materials or methods for securing deck stair stringers to the ground?

While the project suggests gravel, concrete mix, and pavers, alternative methods for ground support include concrete footings or pre-cast concrete piers. The chosen method depends on local frost lines, soil conditions, and building codes. Always ensure the ground connection is robust and prevents settlement or shifting over time.

Deck Stairs

This project outlines the process of building deck stairs using pre-cut stringers. It covers site preparation, attaching the stringers to the deck, securing them to the ground, and installing treads and railings. Safety is paramount throughout the process, and it's recommended to consult local building codes and consider hiring a professional for complex steps.

Read the full guide Browse all guides

Planning this project? Shop Oak Valley Designs.

Install New Risers and Treads — Deck Stairs | Oak Valley Designs

Subscribe for exclusive updates

Be the first to know about promotions, new products, and sales.