Build and Position Concrete Form
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 2 of 10 · Video by The Fixer

Showing 2:04–2:33 of the source video. Watch the full video with every moment.
What happens in this clip
Construct the concrete form using 2x6 lumber. Measure and cut the pieces to the desired length and width of your concrete pad. Nail the pieces together to create a sturdy rectangular frame. Place the assembled form on the ground where the concrete pad will be. Use the previously cut stair stringer and a measuring tape to ensure the form is positioned at the correct distance from the deck. Check that the form is square by measuring the diagonals; they should be equal.
Goal: Create a wooden frame for the concrete pad and place it correctly
What's used
Tools
- 2x6 Lumber
- Circular Saw
- Hammer
- Measuring Tape
- Stair Stringer
About the full video
This project details the process of building a concrete pad for deck stairs, ensuring it's level with the ground and properly cured. It covers planning, building and setting forms, excavating, pouring, and finishing the concrete.
Step 2 of 10: Install Formwork
Cut two pieces of 2x6 lumber to 3 feet in length and two pieces to 2 feet in length. Assemble these pieces into a rectangular frame using screws, ensuring the corners are square. This frame will serve as the mold for the concrete, and its interior dimensions should match the desired final size of the landing pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form (this video)
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.