Remove Formwork
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 10 of 10 · Video by Eternal Harvest Decor

Showing 0:52–0:54 of the source video. Watch the full video with every moment.
What happens in this clip
After the concrete has cured for at least 24 hours (or longer, depending on the mix and conditions), carefully remove the wooden formwork. Gently pry the boards away from the concrete, taking care not to damage the edges of the newly formed concrete strip. The concrete should be hard enough to stand on its own and retain its shape.
Goal: Once the concrete has sufficiently cured and hardened, carefully remove the temporary wooden formwork.
What's used
Tools
- Pry Bar or Hammer
About the full video
This project demonstrates how to set up temporary formwork and dry pour concrete for a narrow concrete strip next to a retaining wall and pool deck. It covers site preparation, formwork installation, dry pouring concrete, adding rebar for reinforcement, screeding, adding control joints, and proper curing techniques using misting.
What's said in this clip
before my next missing an hour later I watered every hour for a total of about six times concrete is extremely porous and it will soak all the water up into the middle and everywhere it needs to it also pulls water up from the ground then I removed the form and it looks so good the other dry pour that I did is holding up really well and I'm wishing I would have done this all the way around the pool
Automatically transcribed from the source video.
Step 10 of 10: Remove Formwork
Once the concrete has cured sufficiently (typically after 24-48 hours, but check local conditions and concrete type), carefully pry off the 2x6 lumber forms. Use a pry bar to gently loosen the forms from the concrete. Be careful not to chip or damage the edges of the concrete pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork (this video)
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.
Read the full guide Browse all guides
Planning this project? Shop Oak Valley Designs.