Lay and Compact Gravel Base
From How to Pour a Concrete Landing Pad for Deck Stairs · Step 3 of 10 · Video by Today's Homeowner with Danny Lipford

Showing 3:15–4:05 of the source video. Watch the full video with every moment.
What happens in this clip
After preparing the forms, lay a base layer of Quikrete All-Purpose Gravel inside the framed area. Spread the gravel evenly across the entire surface. Use a tamper tool to compact the gravel thoroughly. This compacted gravel base helps prevent erosion and provides a stable foundation for the concrete slab. For a pad approximately 32 inches by 6 feet, about two bags of gravel should be sufficient.
Goal: Create a stable and erosion-resistant gravel base for the concrete.
What's used
Tools
- Tamper Tool
- Heavy piece of wood
Materials
- Quikrete All-Purpose Gravel Quikrete
- Washed stone
About the full video
This project guides you through creating a sturdy, level concrete pad for outdoor trash cans, improving the aesthetic and functionality of your yard. It covers preparing the area, constructing form boards, laying a gravel base, mixing and pouring concrete, and applying a broom finish.
Step 3 of 10: Add and Compact Gravel Base
Pour approximately 4 inches of gravel into the excavated area within the formwork. Use a hand tamper or a piece of scrap lumber to firmly compact the gravel. This layer will provide drainage and prevent frost heave, ensuring the longevity of the concrete pad.
Every video in How to Pour a Concrete Landing Pad for Deck Stairs
Step 1: Excavate Area
- 13:17–15:33 Prepare Stair Base and Pour Concrete Pad
- 0:04–0:15 Site Preparation and Trench Digging
- 4:20–8:36 Prepare & Pour Concrete Pad
Step 2: Install Formwork
- 2:04–2:33 Build and Position Concrete Form
- 0:33–0:47 Formwork Installation
- 0:00–0:34 Lay Out and Assemble Initial Form Boards
Step 3: Add and Compact Gravel Base
- 2:21–2:33 Add & Compact Basecourse
- 3:15–4:05 Lay and Compact Gravel Base (this video)
- 0:20–0:38 Prepare Gravel Base
Step 4: Place Rebar or Wire Mesh
- 2:45–3:06 Add Steel Reinforcement (Rebar)
- 1:30–1:40 Add Wire Mesh Reinforcement
- 5:41–6:46 Rebar Placement for Reinforcement
Step 5: Mix and Pour Concrete
- 0:30–0:42 Pour and Level Concrete
- 3:10–3:41 Pour and Screed Concrete
- 1:58–2:31 Mix and Pour Concrete
Step 6: Screed the Concrete
- 0:04–0:13 Screed the Concrete
- 0:24–1:01 Screed the Concrete Surface
- 0:17–0:45 Screed the Concrete Surface
Step 7: Float the Concrete
- 0:16–0:25 Float the Concrete Surface
- 0:44–0:46 Hand Float Concrete Surface
- 1:15–1:29 Float Concrete
Step 8: Finish the Concrete
- 0:07–0:11 Trowel for Smooth Concrete Finish
- 10:04–11:22 Final Troweling and Finishing
- 3:30–4:49 Concrete Floating and Troweling
Step 9: Cure the Concrete
- 2:08–2:39 Cure Concrete
- 0:57–0:59 Cure Concrete and Remove Forms
- 5:50–6:12 Cure the Concrete
Step 10: Remove Formwork
- 8:43–10:04 Remove Form and Backfill
- 4:03–4:08 Remove Formwork
- 0:52–0:54 Remove Formwork
How to Pour a Concrete Landing Pad for Deck Stairs
This project involves creating a stable and level concrete landing pad at the base of deck stairs. The process includes excavating the area, building a form, and pouring and finishing the concrete. This pad provides a safe and durable surface for accessing the deck stairs.